0
gryphon644 created
Hi there, What would be the Consts if I was to switch the UI on my project from Metronic to Velzon (Angular)?
2 Answer(s)
-
0
Hi,
It is hard to make an estimation but if Velzon theme is also Bootstrap based, I assume it would take ~2 weeks for 1 developer to make the change.
-
0
Gotcha! Thanks